CSA S413 PARKING STRUCTURES PDF

Buy CSA S PARKING STRUCTURES from SAI Global. All about CSA S – Parking Structures by Canadian Standards Association. LibraryThing is a cataloging and social networking site for booklovers. for service life prediction of parking structures, in particular methods to evaluate the minimum Canadian design standard (CSA S, ), which are.

Author: Zuk Zulkilar
Country: Central African Republic
Language: English (Spanish)
Genre: Sex
Published (Last): 18 October 2005
Pages: 437
PDF File Size: 12.97 Mb
ePub File Size: 15.34 Mb
ISBN: 970-8-90525-184-8
Downloads: 25565
Price: Free* [*Free Regsitration Required]
Uploader: Zulkisida

The CSA has several publications specifying design requirements for concrete and steel structures.

Brick drainage was nearly impossible due to the waterproofing membrane being in-stalled directly overtop the brick face. Figure 5 is a sample detail for a brick masonry termination to a podium deck slab. tsructures

Standards Subsctiption may be the perfect solution. Need more than one copy? This includes pedestrian traffic areas adjoining to or contained within parking structures. In general, cladding systems should never finish below-grade and there should never be void spaces between the cladding system and the sca deck waterproofing system. Thinner epoxy coatings were susceptible to damage such as pinholes, while thicker coatings could compound the problems of splitting cracks caused by the reduced adhesion of concrete to the coating.

This was likely caused by moisture entrapment in the bricks.

CSA S | Standards Council of Canada – Conseil canadien des normes

Building envelope systems are typically divided into roofs, walls and foundations. Although this may seem trivial in the grand scheme of building design, restoration and building science consultants frequently face challenges in solving waterproofing failures and difficult-to-find leaks.

  COME DIVENTARE UN VERO SEDUTTORE PDF

These include areas such as stairs, and pedestrian bridges from parking structures. In some cases, the issue can be resolved by improving or correcting an existing detail. Proceed to Checkout Continue Shopping.

Byhowever, evidence showed that some concrete parking decks reinforced with FBECR were experiencing severe cracking. He cited the reduction in the number of parking structure restoration projects over the last decade as proof.

Continuity of the waterproofing systems must be maintained. Immediately below the curtain wall pressure plate is a mm void space previously concealed with metal flashing but removed in this photo and a mm tall concrete curb. Influence national and international standards development by commenting on draft standards online.

Canadian Standards Association issues tougher rules for parking garages

Your Alert Profile lists the documents that will be monitored. There are many csq systems available to designers. If the document is revised or amended, you will be notified by email.

The s13 wall cladding system terminated approximately mm above the podium deck slab. This standard is not included in any packages. Infrastructure December 31, This standard is also available to be included in Standards Subscriptions. A potential solution is integrating concrete curbs to protect membranes.

CSA S – Parking Structures

Brick masonry and EIFS systems specify a mm and mm clearance between the underside of the cladding and grade, respectively; Curtain walls termination at grade indicate a waterproofing transition onto a foundation wall; and Flashing systems specify a mm termination above grade. The exposed bricks were found to parjing badly cracked and spalled at structires locations.

Buy Standards Purchase the standards and standards-based products you are looking for. However, in each of the CMHC guidelines, the cladding terminations at grade do not take into account below-grade structures, such as podium decks. Skip to main content Skip to footer. The original standard, published inwas the first one written specifically for the construction of parking structures.

  BMBL 4TH EDITION PDF

It is the intention of this article to identify the challenge in designing effective cladding to podium deck transitions and I hope that designers will consider this issue more carefully in future developments.

Standards Council of Canada

The designer needs to take into account podium deck finishes asphalt pavement, granular overburden, landscaping, etc. CMHC best structuees guide for brick, detail 4. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Hot-applied waterproofing was installed on the podium deck strucfures and terminated flush with the surface of the asphalt pavement removed in this photo.

In other cases, cladding systems need to be locally modified or replaced due to poor base building design. One of the most structufes podium deck waterproofing systems is hot- or cold-applied rubberized asphaltic waterproofing systems.

As previously discussed, improperly detailed cladding to podium deck transitions can result in premature cladding failures, water and moisture infiltration and premature podium waterproofing failures.

Author: admin