DNV RP E305 PDF

RP E On-Bottom Stability Design of Submarine Pipelines. General. This Recommended Practice replaces the following Veritec publications,. None. Hello you guys, I would like to know what are the differences between the two recommanded practices of DNV: DNV RP E and DNV RP. Revision: Edition, October ; Published Date: October ; Status: Superseded By: Superseded By: DNVGL-RP-E; Document Language: English.

Author: Voodoomuro Gazuru
Country: Nepal
Language: English (Spanish)
Genre: Art
Published (Last): 22 September 2006
Pages: 97
PDF File Size: 20.10 Mb
ePub File Size: 3.5 Mb
ISBN: 733-9-81722-658-9
Downloads: 53656
Price: Free* [*Free Regsitration Required]
Uploader: Daramar

Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework. The offshore oil and gas industry uses synthetic fibre ropes across various mission-critical activities where performance and reliability are key concerns. This showed the region was still unstable, despite the reduction in conservatism between the design codes.

These include mooring systems, lifting slings, and deepwater deployment and recovery systems for subsea infrastructure.

Please sign in or become a member for free. Sign up to our newsletter to keep up-to-date with free webinars and white papers, latest news and exclusive offers.

For the remaining unstable 5km region, the stability analysis was re-assessed using the generalised lateral stability and absolute lateral stability methods outlined in DNV-RP-F The RP is intended to serve owners, system integrators, rope manufacturers, manufacturers of load-bearing synthetic yarns and coating, and termination hardware products.

Are you an Engineering professional? The Eng-Tips staff will check this out and take appropriate action. The integrated system behaviour is also very important in offshore mooring. Lifting lines are used for the installation of subsea infrastructure, where the offshore fibre rope performs as an integral part of a lifting appliance and where no function can be seen in isolation.

This showed the pipeline was unstable using these extreme storm conditions. The benefits By verifying pipeline stability based on the as-built concrete coating thickness against the original stability design code, DNV-RP-E, it was possible to conservatively determine that one of the regions was stable.

  HYDROPROCESSING OF HEAVY OILS AND RESIDUA PDF

Close this window and log in. The strength and endurance of synthetic rope, which is fundamentally different to the strength and endurance of steel-wire rope on the basis that mechanisms are different. You should read the first sentence of the Introduction: Defense manufacturing is all about project manufacturing and project accounting.

The tension versus stretch behaviour of synthetic rope, which is fundamentally different to that of steel wire rope. It’s easy to join and it’s free.

The on-bottom stability analysis was performed according to the simplified stability analysis method outlined in DNV-FP-E ‘On-Bottom Stability Design of Submarine Pipelines’, the same methodology used in the original design.

Register now while it’s still free! Therefore, recommendations were made to investigate the condition of the unstable pipeline region. Hello you guys, Dnnv would like to know what are dv differences between the two recommanded practices of DNV: By further attempting to reduce conservatism through DNV-RP-F and an OrcaFlex model, it was found that the second region remained unstable under the three hour storm conditions.

The solution The on-bottom stability analysis was performed according to the simplified stability analysis method outlined in DNV-FP-E ‘On-Bottom Stability Design of Submarine Pipelines’, the same methodology used in the original design.

That’s right, but some data in the version are not clear and I think I will need to go back to the version: Download Now Defense manufacturing is all about project manufacturing and project accounting.

Digital Transformation may be defined in a number of different ways by analysts or enterprise software vendors. Based on the concrete coating thickness recorded in the final survey report, two regions one 3km and another 5km region of the pipeline were found to be unstable.

By joining you are opting in to receive e-mail.

New DNV GL RP on offshore fibre ropes

Students Click Here Join Us! Offshore Fibre Rope should be analysed on the basis of amount of load-bearing material in the cross section, and the characteristics of the material used. Can’t find what you are looking for? Thank you for helping keep Eng-Tips Forums free from inappropriate posts. The design calculations showed that the worst case environmental loading was the hundred year wave and then year current combination.

  CMT 5188 PDF

The as-built concrete coating thickness stated in the final survey report differed from the thickness given in the coating specification, therefore a re-assessment of stability was required. A major operator asked us to undertake a stability analysis of a 20″ trunkline to ensure the pipeline was stable. However, a regular wave analysis using Stokes 5th wave theory showed the pipeline as stable for waves smaller than the hundred year significant wave height combined with the ten year maximum current.

For the 3km region, it was found that the as-laid water depth was greater than that used in the design. Read the article online at: By verifying pipeline stability based on the as-built concrete coating thickness against the original stability design code, DNV-RP-E, it was possible to conservatively determine that one of the regions was stable. Area of interest Engineering Training.

Red Flag This Post Please let us know here why this post is inappropriate. Click Here to join Eng-Tips and talk with other members!

Join your peers on the Internet’s largest technical engineering professional community. This content is available to members only.

differences between DNV RP E and DNV RP F – Off-shore structure engineering – Eng-Tips

Promoting, selling, recruiting, coursework and thesis posting is forbidden. Stability was re-assessed using the revised water depth which showed the region to be stable. For full functionality of this site it is necessary to enable JavaScript.

It emphasises the following key aspects:

Author: admin